PREPAYMENT PREPAYMENT SYSTEM AT Manipur State Power Distribution Company (MSPDCL) (formerly Electricity Department of Manipur, MED) has around 210 000 consumers with AT&C losses of 58%. The peak requirement of power for the year 2011-2012 was 170 – 180 MW against the availability of 30 – 100 MW. The state has no generation capacity except one mini hydro-power project (600 KW); a few diesel power houses and one 36 MW heavy fuel based plant (this cannot be operated due to the high cost of fuel). On the other hand, the recovery from Discoms was only around 50% as their consumers don’t pay bills on time or pay for less than their consumption or don’t pay at all (due to pilferage/tamper). around 15-20% of points were unmetered. Another major challenge was managing peak demand. Generally, in the evening around 6 pm to 9 pm the voltage dropped to 90 volts and consumers were not able to get proper and 24/7 power supply. Due to such power crises, either power shortage or low voltage, industries were not able to run properly and markets / shops were forced to close by 6 pm every day, making it bad for business. All these aspects forced the Manipur government and the Discom to look for a proper solution to the crisis; a solution that helped improve the revenue and the power supply situation in the state. After evaluating various solutions (AMR, prepaid metering system etc.) and taking into account the challenge in GSM/GPRS network availability and coverage throughout Manipur, the difficulties associated with meter reading, bill processing, generation, printing and distribution in the entire Manipur area from small to large consumers, the Discom decided to install prepayment metering. The rationale: using this system 100% revenue is assured as consumers will pay first then they use electricity and the system allows control over consumer load based on a defined sanctioned / contracted load. To evaluate the system and its benefits, the Discom decided to conduct a pilot in an area were losses were very high and where Discom could easily monitor the system benefits and consumer behaviour. So they decided to install around 18 000 meters in the core Imphal area. Implementation Therefore, in order to resolve the issues and to improve the financial situation of the Discoms, MSPDCL decided to implement prepayment metering, which would help them improve revenue and manage load as well in central Imphal. MSPDCL therefore released its first tender for around 18 000 prepayment meters in 2011. The key drivers for Manipur were to: 1 improve revenue cycle and increase its cash flow 2 manage peak demand 30 3 improve billing and collection efficiency 4 control theft of electricity using anti- tamper features in meters. The Discom and the Manipur government were facing tremendous pressure from transmission companies and the generators because they had not paid their dues as per the PPAs. There were huge AT&C losses (80% in 2008-2009). The reason for high AT&C losses was mainly the commercial losses due to poor billing & collection efficiency. Meters installed did not have revenue protection features and The first tender for 18 000 prepayment meters was published in 2011. These meters were installed in the core Imphal area. Once 5 000 meters were installed the Discom did a survey. They found that their revenue had improved, now they received 100% payment for electricity used and the peak demand had gone down by 50%. After the success of the pilot they published another tender for 80 000 prepayment meters. They wanted to roll out prepayment METERING INTERNATIONAL ISSUE – 1 | 2015